West Ealing Renovation
Location
West Ealing
Property size
1499 SQFT
26/11/2025
Finish Date
Start Date
20/07/2025
The work undertaken
This refurbishment project involved extensive light and medium demolition, stripping out fixtures like doors, tiles, sinks, toilets, baths, radiators, and walls across multiple rooms, including relocating drainages and removing outdated systems. Utilities were managed with temporary supplies, site protection, and waste disposal.
New installations included timber stud partitions, tanking, internal doors with thresholds, hot/cold pipework, a gas combi boiler replacement, radiators, towel rails, and heating controls. Bathroom specifics featured showers with trays/mixers/screens, sinks, baths with panels/taps, toilets, and mastic sealing. Electrical upgrades encompassed sockets, switches, lights, extractors, and a doorbell.
Finishes involved ceiling/wall prep, ceramic tiling, laminate flooring, skirting/architraves, painting, and bespoke joinery, culminating in fittings like mirrors and hooks for a polished, efficient outcome.

Visual record
The transformation captured across every stage











Services provided in this project
Safety and Preparation
Isolation and disconnection of all mains services (water, gas, and electrical).
Installation of secure site hoardings and safety barriers.
Internal strip-out, clearance, and preparation worksClearance.
Demolition
Comprehensive structural demolition services carried out safely and efficiently.
Foundations &
Structural Work
Groundworks and foundation construction.
Structural brickwork.
Application of liquid screed flooring.
Refurbishment of suspended floor systems.
Construction of new internal partition walls.
Insulation
Installation of high-performance fire-rated and acoustic insulation to enhance thermal efficiency and soundproofing between floors.
Windows, Doors
and Balconies
Installation of front and rear heavy-duty steel security doors.
Replacement and upgrading of balcony doors.
Installation of new doors, door frames, and architraves.
Utilities &
Mechanical Systems
Partial or full electrical rewiring.
Installation of CCTV and security systems.
Integration of modern central heating systems.
Full installation of building service systems.
Floor & wall Finsihes
Installation of dry lining systems.
Professional tiling .
Supply and installation of laminate flooring.
Acoustic separation upgrades.
Installation of skirting boards and finishing trims.
Joinery and Fixtures
Custom bespoke joinery services.
Design and installation of standard and bespoke kitchens.
Worktop supply and installation.
Bathroom installation and upgrades.
Installation of luxury features, including jacuzzi bathtubs and ceiling-mounted shower systems.
Decorating & Rendering
Complete internal decorating services.
Wall repair, restoration, and finishing.

Telephone
0330 133 0064
Address
124 City Road, London, England, EC1V 2NX
Office@sh-enterprise.com
Sh-Enterprise © 2025
Sh-Enterprise is a trading name of Shiroka Enterprise Ltd
Registered in England and Wales, Company No. 12633839
Registered office: 124 City Road, London, England, EC1V 2NX










