West Ealing Renovation

Location

West Ealing

Property size

1499 SQFT

26/11/2025

Finish Date

Start Date

20/07/2025

The work undertaken

This refurbishment project involved extensive light and medium demolition, stripping out fixtures like doors, tiles, sinks, toilets, baths, radiators, and walls across multiple rooms, including relocating drainages and removing outdated systems. Utilities were managed with temporary supplies, site protection, and waste disposal.


New installations included timber stud partitions, tanking, internal doors with thresholds, hot/cold pipework, a gas combi boiler replacement, radiators, towel rails, and heating controls. Bathroom specifics featured showers with trays/mixers/screens, sinks, baths with panels/taps, toilets, and mastic sealing. Electrical upgrades encompassed sockets, switches, lights, extractors, and a doorbell.


Finishes involved ceiling/wall prep, ceramic tiling, laminate flooring, skirting/architraves, painting, and bespoke joinery, culminating in fittings like mirrors and hooks for a polished, efficient outcome.

Visual record

The transformation captured across every stage

Services provided in this project


Safety and Preparation

  • Isolation and disconnection of all mains services (water, gas, and electrical).

  • Installation of secure site hoardings and safety barriers.

  • Internal strip-out, clearance, and preparation worksClearance.


Demolition

  • Comprehensive structural demolition services carried out safely and efficiently.


Foundations &

Structural Work

  • Groundworks and foundation construction.

  • Structural brickwork.

  • Application of liquid screed flooring.

  • Refurbishment of suspended floor systems.

  • Construction of new internal partition walls.

Insulation

  • Installation of high-performance fire-rated and acoustic insulation to enhance thermal efficiency and soundproofing between floors.


Windows, Doors

and Balconies

  • Installation of front and rear heavy-duty steel security doors.

  • Replacement and upgrading of balcony doors.

  • Installation of new doors, door frames, and architraves.

Utilities &

Mechanical Systems

  • Partial or full electrical rewiring.

  • Installation of CCTV and security systems.

  • Integration of modern central heating systems.

  • Full installation of building service systems.

Floor & wall Finsihes

  • Installation of dry lining systems.

  • Professional tiling .

  • Supply and installation of laminate flooring.

  • Acoustic separation upgrades.

  • Installation of skirting boards and finishing trims.

Joinery and Fixtures

  • Custom bespoke joinery services.

  • Design and installation of standard and bespoke kitchens.

  • Worktop supply and installation.

  • Bathroom installation and upgrades.

  • Installation of luxury features, including jacuzzi bathtubs and ceiling-mounted shower systems.

Decorating & Rendering

  • Complete internal decorating services.

  • Wall repair, restoration, and finishing.

Ready to start your project

Get in touch to discuss your refurbishment or development needs with our team.

Telephone

0330 133 0064

Address

124 City Road, London, England, EC1V 2NX

E-mail

Office@sh-enterprise.com

Sh-Enterprise © 2025


Sh-Enterprise is a trading name of Shiroka Enterprise Ltd

Registered in England and Wales, Company No. 12633839

Registered office: 124 City Road, London, England, EC1V 2NX